Optimal design and selection of gensets, fuel-type and connected electrical infrastructure benefits from the support of engineering expertise from the supplier.
After years of planning and capital commitment, your construction project is scheduled to break ground in just a few weeks, with temporary power generation for the construction site yet to be ordered. That may not be a problem if only small loads are to be powered-up on an intermittent basis. However, considering the tight scheduling processes seen in many construction projects, unforeseen events that could benefit from more capable temporary power generation should be part of the scoping process.